Bookkeeping Exercises
Menu

Bookkeeping by business type

Bookkeeping for contractors: jobs, materials and retainage

Track costs by job, record materials and subcontractor bills, bill progress payments with retainage receivable, and keep W-9s ready for Form 1099-NEC.

By TNas · · 8 min read

Bookkeeping for contractors comes down to three habits: tag every cost to a job, bill customers as the work progresses, and track the retainage customers hold back as money still owed to you. Materials, crew wages and subcontractor bills all carry a job number, so each project shows its own profit. When a customer holds back part of each payment until the job is finished, that amount goes to a retainage receivable account, not into a write-off or a reduction of revenue.

The examples follow a fictional remodeling company, Ridgeline Remodeling, through one $60,000 kitchen and bath job (Job 112). All names and figures are invented for illustration.

What makes contractor books different

A shop that sells the same product every day can read its profit straight off the income statement. A contractor can't. One month might include the start of three jobs and the end of two others, and the company total hides which jobs made money and which lost it.

Contractor bookkeeping adds three things to normal small-business books:

  • Job costing: every direct cost is tagged to a job.
  • Progress billing: customers are invoiced in stages as work is completed, not once at the end.
  • Retainage: a percentage of each progress bill is held back by the customer until the job is accepted, and the contractor often holds back the same from its subcontractors.

Everything else (bank reconciliations, payroll, depreciation on trucks and tools) works the same way it does for any business. Buying the work truck itself is covered in how to record a vehicle purchase.

Job costing: give every cost a home

Job costing is the practice of recording each direct cost against the specific job it was spent on. Direct costs are the ones you'd avoid if you didn't take the job: materials, subcontractors, crew labor and equipment rented for that site.

Most accounting software lets you add a job, project or class tag to each line of a bill or timesheet. The general ledger still shows totals by account, and the tags work like a subledger that splits those totals by job. The lesson on subledgers and control accounts explains why the two must always agree.

A simple chart of accounts for job costs looks like this:

Account Type Tag each line with
Job Costs – Materials Expense Job number
Job Costs – Subcontractors Expense Job number
Job Costs – Direct Labor Expense Job number
Job Costs – Equipment Rental Expense Job number
Office Rent, Insurance, Vehicle costs Expense Overhead (no job)

Keep overhead separate. Office rent, general liability insurance and the owner's truck don't belong to any one job, so they sit below the job costs and are covered by the profit from all jobs together.

Recording materials and subcontractor bills

Ridgeline buys cabinets, tile and fixtures for Job 112 from a supplier on 30-day terms. The bill goes to a job cost account, tagged to Job 112, and to accounts payable.

Journal entry
AccountDebitCredit
Supplier bill for Job 112 materials
Job Costs – Materials$4,200.00
Accounts Payable$4,200.00

If you buy a bulk lot of materials for several future jobs, record it in an Inventory or Materials on Hand asset first, then move the cost to each job as it's used. Charging a whole bulk purchase to the first job overstates that job's cost and understates the next ones.

Withholding retainage from a subcontractor

Ridgeline hires a licensed plumber for $6,000 of work on Job 112. Their subcontract lets Ridgeline hold back 10% until the job is finished, mirroring what the homeowner holds back from Ridgeline. The bill is recorded in full, but only $5,400 is owed now. The $600 held back is still owed, just later, so it's a separate liability.

Journal entry
AccountDebitCredit
Plumbing subcontractor bill, 10% retainage held
Job Costs – Subcontractors$6,000.00
Accounts Payable$5,400.00
Retainage Payable$600.00

When the job is complete and the plumber's work is accepted, Ridgeline pays the retainage.

Journal entry
AccountDebitCredit
Release retainage to the plumber at job completion
Retainage Payable$600.00
Cash$600.00

The lesson on recording supplier bills shows the basic bill entry this builds on.

Progress billing and retainage receivable

Retainage (also called retention) is a percentage of each progress payment that the customer holds back until the job is finished, as an assurance that the work will be completed. The contract sets the percentage and the release terms.

Ridgeline's contract for Job 112 is $60,000, billed by percentage of completion, with 10% retainage. At the end of the first month the job is 40% complete, so Ridgeline bills $24,000. The customer will pay $21,600 now and hold $2,400.

Revenue is the full $24,000, because that much work has been done and billed. The held-back $2,400 is not lost or discounted; it's an amount the customer owes later, so it goes to its own asset account. Keeping it separate from regular accounts receivable stops it showing up as overdue in the aging report.

Journal entry
AccountDebitCredit
Progress bill 1 for Job 112, 40% complete
Accounts Receivable$21,600.00
Retainage Receivable$2,400.00
Contract Revenue$24,000.00

When the customer pays the first bill:

Journal entry
AccountDebitCredit
Customer pays progress bill 1
Cash$21,600.00
Accounts Receivable$21,600.00

Each later bill works the same way. After the final bill, Retainage Receivable for Job 112 holds 10% of the whole contract, $6,000. When the customer signs off on the finished job and pays the retainage:

Journal entry
AccountDebitCredit
Customer releases retainage on Job 112
Cash$6,000.00
Retainage Receivable$6,000.00

Review Retainage Receivable job by job each month. A retainage balance on a job that finished months ago is a collection task, not a number to leave sitting. Most small contractors expect to collect it within a year, so it's shown with current assets; if your contracts run longer, ask your accountant how to present it.

When billing and work don't line up

Progress bills don't always match the work done by month-end. If you've done more work than you've billed, or billed ahead of the work, the revenue in the books may need an adjustment at month-end. The lessons on revenue recognition and accruals explain the basic principle: revenue belongs in the period the work is performed. Larger contractors use specific methods for long contracts; a CPA can tell you what applies to yours.

Customer deposits before work starts

Many contractors ask for a deposit before ordering materials. Until the work it pays for is done, a deposit is unearned revenue: you hold the customer's money and owe them the work.

Suppose Ridgeline collected a $5,000 deposit on a new job, Job 118, before starting.

Journal entry
AccountDebitCredit
Deposit received for Job 118 before work starts
Cash$5,000.00
Unearned Revenue$5,000.00

When the first progress bill goes out, the deposit is applied against it, reducing what the customer still owes. The sibling post on customer deposits and retainers walks through applying and refunding deposits.

Reading a job cost report

Once costs are tagged, a job cost report shows each job's profit. Here's Job 112 at completion.

Job 112 Amount
Contract revenue $60,000
Materials ($18,500)
Subcontractors ($21,000)
Direct labor ($9,800)
Job gross profit $10,700
Gross profit as % of revenue 17.8%

The job's gross profit has to cover overhead and leave a profit for the company. Comparing each job's actual costs with the estimate is how a contractor learns to price the next job. A job that ran over on labor or materials shows up here long before it shows up in the year-end totals.

Subcontractors, W-9s and Form 1099-NEC

Subcontractors are usually paid as independent contractors, not employees, and that choice has tax consequences. The IRS says the key question is the right to direct and control how the work is done, and it groups the evidence into behavioral control, financial control and the type of relationship (IRS, Independent contractor or employee?). If you're unsure how a worker should be treated, ask a tax professional before the first payment.

For subcontractors who are independent contractors, Form 1099-NEC reports nonemployee compensation. The IRS instructions for tax years beginning after 2025 set the box 1a threshold at $2,000 or more, and say it may be adjusted for inflation starting in 2027. Payments to a corporation are generally not reported, with exceptions such as attorneys' fees. The form is due to the IRS and to the payee by January 31 (IRS, Instructions for Forms 1099-MISC and 1099-NEC).

The bookkeeping habit that makes this easy is collecting Form W-9 before you pay anyone. The IRS describes the W-9 as the form a payee uses to give their correct taxpayer identification number to someone who must file an information return (IRS, About Form W-9). Store the W-9 with the vendor record, and make sure every subcontractor payment is recorded against that vendor so year-end totals are right.

A monthly close for a contracting business

Step What to check
1. Tag review Every job cost line carries a job number
2. Bills and timesheets All supplier and subcontractor bills for the month entered
3. Progress billing Bills issued for work completed; retainage split out
4. Retainage balances Receivable and payable listed by job; old balances followed up
5. Reconcile accounts Bank, credit cards, AR and AP agree to statements and subledgers
6. Job cost report Actual costs compared with estimates for open jobs

The month-end close checklist covers the general steps, and the AR and AP simulator is a good place to practice invoices and bills side by side.

Frequently asked questions

Is retainage receivable income when I bill it or when I collect it?

On accrual books, the work is billed and earned when the progress bill goes out, so the full bill is revenue then. The retainage portion is an asset (money owed to you) until collected. Tax timing can differ; ask a tax professional.

Should materials go to inventory or straight to the job?

Materials bought for a specific job go straight to that job's cost. Bulk materials held for future jobs go to an asset account first and move to job costs as they're used.

Where does equipment like a truck or a mixer go?

Equipment used across many jobs is a fixed asset, not a job cost. Record it at cost and depreciate it; see capitalizing fixed assets.

What to practice next

Contractor books depend on clean receivables and payables. Practice the receivable side, including partial payments, in the accounts receivable exercises, then the bill side in the accounts payable practice. The revenue recognition practice set helps with deciding when billed work is earned. For a full month of a service trade, including a financed van and a bad-debt write-off, try the appliance repair service project.

Sources

  1. Instructions for Forms 1099-MISC and 1099-NEC — IRS
  2. About Form W-9, Request for Taxpayer Identification Number and Certification — IRS
  3. Independent contractor (self-employed) or employee? — IRS

Educational content for US small-business bookkeeping, not tax, legal or accounting advice. Example businesses and figures are fictional. See our editorial policy for how we write and correct content.